PIKEROWAN Landscape & Stone Get a Free Quote
A Chester County garden at golden hour with a dry-laid fieldstone terrace, fire pit and seating beside a broad lawn

Beautiful stone, built to stay

Outdoor Spaces Designed to Endure.

Dry-laid walls, terraces and steps across Chester County — set without mortar, with the design, drainage and planting that goes around them.

Dry-Laid MethodNo mortar, no footing, no cracking
Our Own CrewWho quotes it is who builds it
Priced Per LineSee what each part costs
Two Seasons’ CareWritten into the contract

Our Services

Stonework and Everything Around It

A dry-laid fieldstone retaining wall with broad stone steps rising through planting

Dry-Laid Stonework

Walls, terraces, steps and piers set by hand, without mortar.

Learn More
A designed garden with a shaped lawn, curved borders and a fieldstone path

Landscape Design

A measured drawing of the whole property, priced line by line.

Learn More
A deep mixed border of hydrangea and grasses along the foot of a fieldstone wall

Planting & Borders

Beds rebuilt to depth, planted for Pennsylvania clay.

Learn More
A freshly maintained garden with clipped boxwood and crisp cut lawn edges

Garden Care

Pruning, bed work and seasonal cutting, year on year.

Learn More

Featured Projects

Real Ground. Lasting Work.

View All Projects →
A fieldstone terrace with a lit fire pit and deep seating at dusk

Backyard living oasis

Pocopson, PA
A stone-edged garden pond with a low cascade over set fieldstone

A spring, put back to work

West Goshen, PA
Broad fieldstone steps descending a planted slope in three terraces

Six feet of fall, in steps

Birmingham, PA
A fieldstone path between two stone piers leading to a sheltered seating area

Why Choose Pike & Rowan

More Than Stone.
A Garden That Holds.

We build the half nobody sees first — levels, drainage and base — because that is what decides whether the part you do see is still right in twenty years.

Expert Craftsmanship

Set by hand, mortar-free, by the crew that quoted it.

Planted for the Soil

Chosen for Pennsylvania clay, not a catalogue photograph.

Priced Per Line

Cut the steps or the planting without redoing the quote.

Two Seasons of Care

In the contract. Anything that does not take, we replace.

Our Process

From First Walk to Finished Ground

1. Consultation

We walk the whole property and read the levels and the water.

An hour, free

2. Design

A drawing with every stone and plant named, priced line by line.

Two to three weeks

3. Build

Ground and drainage first, then stone. Skilled, careful, on time.

Weeks one to three

4. Maintain

Planting last, then two full seasons of establishment care.

Two years

The Same Ground, Twice

Before, and Two Seasons Later

Every pair is one property photographed from one spot — not a finished garden borrowed from somebody else’s job.

A plain suburban back garden with a small concrete slab, patchy lawn and play equipment The same garden with a dry-laid stone terrace, seat wall, deep borders and an even lawn BeforeAfter

Willistown · back gardenA slab you could not get a table on became a terrace, with borders down both fence lines.

A blue colonial house with a plain mown lawn and no planting The same house with a stone entry path, foundation planting and cut-edged beds BeforeAfter

East Bradford · frontageThe front door was invisible from the road. A stone walk gave the house somewhere to sit.

A large house with a wide concrete driveway and a thin strip of mulch The same drive with a low dry-laid retaining wall, specimen trees and layered planting BeforeAfter

Downingtown · driveway bankThe bank washed onto the concrete every storm. A dry-laid wall holds it and drains through itself.

A newly built house standing on raw graded earth with no landscaping The same house with a dry-laid retaining wall, stone steps, deep borders and new lawn BeforeAfter

Newlin · new buildHanded over as bare clay. Wall, steps, borders and lawn in one season.

What People Say

Neighbours, Mostly

4.9 across 186 reviews on Google.

A dry-laid fieldstone wall beside a timber gate with ferns at its foot
Two firms wanted to pour a footing and face it with stone. Pike & Rowan were the only ones who said the wall would last longer without one, and explained why. Four winters, not a stone moved.
DHDana H.Malvern, PA · on Google
A low fieldstone retaining wall holding a planted bank beside a lawn
They found the real problem in twenty minutes — water off the barn roof, not the grade. Fixing that cost a third of what I had been quoted to rebuild the terrace.
MCMarcus C.Chadds Ford, PA · on Google
Daylilies and grasses in flower along the top of a stone retaining wall
Second spring now. They came back twice without an invoice to replace three shrubs that did not take. Nobody told me that was in the contract.
PRPriya R.Kennett Square, PA · on Google
A lichened capstone set level on a tightly stacked mortar-free wall
Set by hand, no mortar
A stone farmhouse behind a broad lawn with deep curved planted borders
Whole-property design
A flowering perennial border spilling over the top of a low stone wall
Planted the same season

Where We Work

Forty Minutes From the Yard

Everything we build is close enough that we can come back the same week if something needs looking at — the entire reason we do not take work outside the county.

West ChesterMalvernKennett Square Chadds FordDowningtownWillistown PocopsonBirminghamEast Bradford NewlinUnionvilleExton

Book a free visit

Four fields. We will call within one working day.

No obligation, and we do not pass your details to anyone.

Thank you.

We will call within one working day to arrange the visit.

A flagstone courtyard enclosed by fieldstone walls with a stone bench and planted pots

Straight Answers

The Six Things People Actually Ask

Most retaining walls land between $180 and $320 a square face foot, and the spread is almost entirely access and drainage rather than the stone. A wall a wheelbarrow can reach costs far less than one where everything is carried. We price per line so you can see it.

The opposite, here. A mortared wall on a footing is rigid, so when the ground heaves in February something cracks — usually the mortar. A dry-laid wall drains through itself, settles a fraction and stays standing. The two-hundred-year-old walls in this county are all dry-laid.

Two to three weeks to the drawing and price, then we book you in. Most walls and terraces are three weeks on site. If we are eight weeks out we will say so on the phone.

Yes, as long as it is stone or the ground around it — steps, a gate pier, ten feet of wall. What we will not do is turn up for something you could reasonably do yourself; we will say that on the phone and save you the visit.

Chester County fieldstone and Avondale schist from two quarries within half an hour, plus reclaimed stone off local farms when we can get it. Reclaimed is usually cheaper and looks right from day one, because it has already weathered here.

Stonework carries a five-year structural guarantee, planting two full seasons of establishment care. In twenty-three years we have rebuilt two walls. Both were on ground we had warned about and should have refused — which is why we now walk the whole property before quoting.

Ready to transform your outdoor space?

Book Your Free Consultation Today.

We walk the whole property with you and tell you what is worth doing — including the parts that are not.

Get a Free Quote

Quick. Easy. No obligation.